House Renovation at Camden Terrace Clifton
Extension and Rennovation
Project Outline
Foley Allan delivered a side extension and full renovation of a large 1930s semi on Camden Terrace in Clifton. The works included incorporating the existing garage to create one large open-plan kitchen and dining area with utility and WC space. The project also involved full rewiring, new plumbing and high-specification finishes throughout. Completed in eight weeks despite tight access and structural challenges the client and team were delighted with the result.
Key features
• Side extension forming open-plan kitchen and dining
• Garage integration into new living space
• Full rewiring and plumbing upgrade
• High-specification interior finishes
• Completed in eight weeks on Camden Terrace Clifton
With our first baby due in 9 weeks we moved into our new house in Clifton, which needed very major structural work. Additionally, the entire house needed re-wiring, new plumbing, a new kitchen, complete redecoration, new flooring… the list goes on. We found Don and Peter on the internet knowing we might need a little more than just a builder. How right we were!
Don gave us a budget, with which we were just about comfortable, and his challenge with Peter was to deliver a finished job before my wife ‘delivered’. It was ‘nip and tuck’ – our new little girl was a few days early, but then so was Don, thank goodness.
It was an adventure to say the least, but we are delighted with the result and would have no hesitation recommending him and Peter.
In point of fact, we recently had someone over who used to be a specialist RSJ installer who thought it was one of the biggest jobs he’d seen and couldn’t believe that all the work had been completed in 8 weeks, adding “personally – I wouldn’t have wanted to manage that gig!”.
The most important thing for us was that the project did not overrun, and despite unforeseen circumstances (such as 1850s plumbing!) it ran according to schedule. The timescale for this project was really challenging, and it is also to Don and Peter’s credit that they achieved so much of the planning and costing with such limited access to the site. Their first visit was the day we moved in!
Project Gallery
View more related projects
Click to view